In my mind I've sort of accepted that it's not going to be this season now. Though I don't own a season ticket so it doesn't bother me that much.
But I can't quite understand how it is taking SO much longer. There must be big reasons? And how did anyone think it would be ready by the start of the season?
I can't quite buy into the conspiracy theory the the club knew it would take this long all along
just shouldve agreed to play at wembley for 2 seasons ffs was never going to happen in 1 season and its getting delayed even more by the day. We were fed lies and false hope yet again, the club never fails with that.
So those faulty safety systems is taking a year to sort out?
£400m loan secured for snagging
comment by Desperate Dier (U6468)
posted 19 minutes ago
So those faulty safety systems is taking a year to sort out?
----------------------------------------------------------------------
He didn't say specifically why he expected it to be at least March before we go in but that would be just one part.
From what Levy and other official comms have said I get the feeling that our goal of moving in this calendar year was with a view that the stadium wouldn't be completely finished anyway but we'd play and they would carry on finishing off in the background like we did with the tearing down of the stadium.
They've probably thought it's already delayed now. Might as well try and get it all done before we open rather than a half-arsed completion which is fair.
But ultimately, it's either poor planning or communications or both from Spurs.
I think it will be ready way before March, inside is finished as far as I know, just cosmetic stuff on the outside to finish. I reckon January sometime, probably Man United match.
Jeeez H Chr!st
we are going to have an awesome stadium to be proud of for generations to come.
We are 4th in the league, 3 points off the mighty unbeaten Liverpool, and 1 behind in-form Chelsea despite 8 away games and injuries to key players.
Yes this is a difficult season with the stadium situation, injuries, lack of signings and fixtures. But this has been out BEST EVER PREMIER LEAGUE START.
Fecking Spurs fans !!!
Given the delays it would now be best IMO to wait until it is 100% complete rather than moving in as soon as possible and spending months on snags and extras etc
We should also focus on the fact that it will be the best in Britain once complete
comment by NUTS (U21985)
posted 1 minute ago
Given the delays it would now be best IMO to wait until it is 100% complete rather than moving in as soon as possible and spending months on snags and extras etc
We should also focus on the fact that it will be the best in Britain once complete
----------------------------------------------------------------------
sounds lovely but every game we are not there we are losing money. Wembley attendances (bar Chelsea) are now restricted to 51k. We're paying a hefty hiring fee while refunding tickets to ST holders.
We need to get in ASAP and will do so as soon as its passed as safe.
I think things are going a bit ott with Man City. While there is a difference in quality it is only the recent result that sets us apart. Reverse the result and we would be a point clear at the top.
comment by Devonshirespur (U6316)
posted 8 minutes ago
Jeeez H Chr!st
we are going to have an awesome stadium to be proud of for generations to come.
We are 4th in the league, 3 points off the mighty unbeaten Liverpool, and 1 behind in-form Chelsea despite 8 away games and injuries to key players.
Yes this is a difficult season with the stadium situation, injuries, lack of signings and fixtures. But this has been out BEST EVER PREMIER LEAGUE START.
Fecking Spurs fans !!!
----------------------------------------------------------------------
Alright calm down
I don't know what you're getting wound up for when the article is about a delay in stadium build and hopefully seeing us play some good football again which we haven't despite getting results (outside of the CL) and by the way..
OUR BEST EVER PREMIER LEAGUE START HAS US SITTING 4TH AND NOT WINNING ANYTHING SO STOP USING THAT TO PAINT OVER THE CRACKS
comment by Hod idol the x factor - Mo's posh tin set! (U5117)
posted 1 minute ago
I think things are going a bit ott with Man City. While there is a difference in quality it is only the recent result that sets us apart. Reverse the result and we would be a point clear at the top.
----------------------------------------------------------------------
Reverse what result? You might as well start reversing Newcastle's results and assume if they didn't lose they'd be top of the league
comment by Devonshirespur (U6316)
posted 3 minutes ago
comment by NUTS (U21985)
posted 1 minute ago
Given the delays it would now be best IMO to wait until it is 100% complete rather than moving in as soon as possible and spending months on snags and extras etc
We should also focus on the fact that it will be the best in Britain once complete
----------------------------------------------------------------------
sounds lovely but every game we are not there we are losing money. Wembley attendances (bar Chelsea) are now restricted to 51k. We're paying a hefty hiring fee while refunding tickets to ST holders.
We need to get in ASAP and will do so as soon as its passed as safe.
----------------------------------------------------------------------
It’s not so much losing money though and more about not making as such. Sometimes you just have to bite the bullet and take a hit
The cost of a poor public image may actually cost more
The only place in London to watch Europa next season
comment by 8bit (U2653)
posted 6 minutes ago
The only place in London to watch Europa next season
----------------------------------------------------------------------
You do know we're 4th and you're 5th, right?
comment by NUTS (U21985)
posted 18 minutes ago
comment by Devonshirespur (U6316)
posted 3 minutes ago
comment by NUTS (U21985)
posted 1 minute ago
Given the delays it would now be best IMO to wait until it is 100% complete rather than moving in as soon as possible and spending months on snags and extras etc
We should also focus on the fact that it will be the best in Britain once complete
----------------------------------------------------------------------
sounds lovely but every game we are not there we are losing money. Wembley attendances (bar Chelsea) are now restricted to 51k. We're paying a hefty hiring fee while refunding tickets to ST holders.
We need to get in ASAP and will do so as soon as its passed as safe.
----------------------------------------------------------------------
It’s not so much losing money though and more about not making as such. Sometimes you just have to bite the bullet and take a hit
The cost of a poor public image may actually cost more
----------------------------------------------------------------------
Public image takes a bigger knock if we stay at Wembley all season.
Once this place opens, all will marvel in its awesomeness and the troubles we've had achieving it will be forgotten, or at least put into perspective.
They had a gathering of club bigwigs at the new stadium a few days ago, in one of the lounges with food and drink etc. Why would they bother doing something like that if completion was not close?
I can`t wait for December and the promised update, hopefully it can open in January and no later than February.
Surely once all the work is completed, any relevant safety certificates can be completed in a matter of days or at the worst a couple of weeks.
It`s all so frustrating and Spursy.
comment by Hod idol the x factor - Mo's posh tin set... (U5117)
posted 25 minutes ago
I think things are going a bit ott with Man City. While there is a difference in quality it is only the recent result that sets us apart. Reverse the result and we would be a point clear at the top.
----------------------------------------------------------------------
actually we'd be behind LFc on GD.
But i take your point although i would say it shows that we are small margins away from being very competitive. What City are achieving is amazing. 100 pts last season is simply brilliant. only 4 dropped this season which puts them on target for 100 again!!
IMO we are doing well to remain competitive given our circumstances and the way we have built our team vs the approach they have taken (which has prompted UEFA investigation)
comment by Devonshirespur (U6316)
posted 3 minutes ago
comment by NUTS (U21985)
posted 18 minutes ago
comment by Devonshirespur (U6316)
posted 3 minutes ago
comment by NUTS (U21985)
posted 1 minute ago
Given the delays it would now be best IMO to wait until it is 100% complete rather than moving in as soon as possible and spending months on snags and extras etc
We should also focus on the fact that it will be the best in Britain once complete
----------------------------------------------------------------------
sounds lovely but every game we are not there we are losing money. Wembley attendances (bar Chelsea) are now restricted to 51k. We're paying a hefty hiring fee while refunding tickets to ST holders.
We need to get in ASAP and will do so as soon as its passed as safe.
----------------------------------------------------------------------
It’s not so much losing money though and more about not making as such. Sometimes you just have to bite the bullet and take a hit
The cost of a poor public image may actually cost more
----------------------------------------------------------------------
Public image takes a bigger knock if we stay at Wembley all season.
Once this place opens, all will marvel in its awesomeness and the troubles we've had achieving it will be forgotten, or at least put into perspective.
----------------------------------------------------------------------
Yeah, I totally get that as well 👍
comment by Billy The Yidd (U3924)
posted 1 minute ago
They had a gathering of club bigwigs at the new stadium a few days ago, in one of the lounges with food and drink etc. Why would they bother doing something like that if completion was not close?
I can`t wait for December and the promised update, hopefully it can open in January and no later than February.
Surely once all the work is completed, any relevant safety certificates can be completed in a matter of days or at the worst a couple of weeks.
It`s all so frustrating and Spursy.
----------------------------------------------------------------------
I saw that. The photos and videos looked amazing albeit wasn't a fan of that MJ performance with the epileptic lighting.
Really close to the pitch which is great.
Wembley attendances are now restricted to 51k
----------------------
Why is that?
comment by Hulk's little brother Yoda (U1250)
posted 2 minutes ago
Wembley attendances are now restricted to 51k
----------------------
Why is that?
----------------------------------------------------------------------
They are only allowed by the Council to have a certain number of full capacity events every year, given the disruption caused when 70k-90k people rock up in the area.
comment by 8bit (U2653)
posted 48 minutes ago
The only place in London to watch Europa next season
----------------------------------------------------------------------
Selling tickets to Emirates?
comment by NotSoMagicJuande (U1913)
posted 4 hours, 45 minutes ago
In my mind I've sort of accepted that it's not going to be this season now. Though I don't own a season ticket so it doesn't bother me that much.
But I can't quite understand how it is taking SO much longer. There must be big reasons? And how did anyone think it would be ready by the start of the season?
I can't quite buy into the conspiracy theory the the club knew it would take this long all along
----------------------------------------------------------------------
Agree with you, been saying it for ages.
Firstly how did the club think we’d build such a large stadium from scratch in 15 months, considering another similar sized stadium in the emirates took 22 months?
Secondly, how the fack does a 15 month project run at least 6 months late? Not as if we suffered from some unforeseen natural disaster such as a facking volcano eruption, it was just plain bad planning and unrealistic expectations being set. Off the back off the mess we’ve made, Brentford actually increased the original timeframe to build their new stadium so as to avoid the embarrassment we’ve faced.
But i take your point although i would say it shows that we are small margins away from being very competitive. What City are achieving is amazing. 100 pts last season is simply brilliant. only 4 dropped this season which puts them on target for 100 again!!
——————-
City have a great team.............only cost them a £billion as well
Sign in if you want to comment
Stadium for 19/20
Page 1 of 2
posted on 14/11/18
In my mind I've sort of accepted that it's not going to be this season now. Though I don't own a season ticket so it doesn't bother me that much.
But I can't quite understand how it is taking SO much longer. There must be big reasons? And how did anyone think it would be ready by the start of the season?
I can't quite buy into the conspiracy theory the the club knew it would take this long all along
posted on 14/11/18
just shouldve agreed to play at wembley for 2 seasons ffs was never going to happen in 1 season and its getting delayed even more by the day. We were fed lies and false hope yet again, the club never fails with that.
posted on 14/11/18
So those faulty safety systems is taking a year to sort out?
posted on 14/11/18
£400m loan secured for snagging
posted on 14/11/18
comment by Desperate Dier (U6468)
posted 19 minutes ago
So those faulty safety systems is taking a year to sort out?
----------------------------------------------------------------------
He didn't say specifically why he expected it to be at least March before we go in but that would be just one part.
From what Levy and other official comms have said I get the feeling that our goal of moving in this calendar year was with a view that the stadium wouldn't be completely finished anyway but we'd play and they would carry on finishing off in the background like we did with the tearing down of the stadium.
They've probably thought it's already delayed now. Might as well try and get it all done before we open rather than a half-arsed completion which is fair.
But ultimately, it's either poor planning or communications or both from Spurs.
posted on 14/11/18
I think it will be ready way before March, inside is finished as far as I know, just cosmetic stuff on the outside to finish. I reckon January sometime, probably Man United match.
posted on 14/11/18
Jeeez H Chr!st
we are going to have an awesome stadium to be proud of for generations to come.
We are 4th in the league, 3 points off the mighty unbeaten Liverpool, and 1 behind in-form Chelsea despite 8 away games and injuries to key players.
Yes this is a difficult season with the stadium situation, injuries, lack of signings and fixtures. But this has been out BEST EVER PREMIER LEAGUE START.
Fecking Spurs fans !!!
posted on 14/11/18
Given the delays it would now be best IMO to wait until it is 100% complete rather than moving in as soon as possible and spending months on snags and extras etc
We should also focus on the fact that it will be the best in Britain once complete
posted on 14/11/18
comment by NUTS (U21985)
posted 1 minute ago
Given the delays it would now be best IMO to wait until it is 100% complete rather than moving in as soon as possible and spending months on snags and extras etc
We should also focus on the fact that it will be the best in Britain once complete
----------------------------------------------------------------------
sounds lovely but every game we are not there we are losing money. Wembley attendances (bar Chelsea) are now restricted to 51k. We're paying a hefty hiring fee while refunding tickets to ST holders.
We need to get in ASAP and will do so as soon as its passed as safe.
posted on 14/11/18
I think things are going a bit ott with Man City. While there is a difference in quality it is only the recent result that sets us apart. Reverse the result and we would be a point clear at the top.
posted on 14/11/18
comment by Devonshirespur (U6316)
posted 8 minutes ago
Jeeez H Chr!st
we are going to have an awesome stadium to be proud of for generations to come.
We are 4th in the league, 3 points off the mighty unbeaten Liverpool, and 1 behind in-form Chelsea despite 8 away games and injuries to key players.
Yes this is a difficult season with the stadium situation, injuries, lack of signings and fixtures. But this has been out BEST EVER PREMIER LEAGUE START.
Fecking Spurs fans !!!
----------------------------------------------------------------------
Alright calm down
I don't know what you're getting wound up for when the article is about a delay in stadium build and hopefully seeing us play some good football again which we haven't despite getting results (outside of the CL) and by the way..
OUR BEST EVER PREMIER LEAGUE START HAS US SITTING 4TH AND NOT WINNING ANYTHING SO STOP USING THAT TO PAINT OVER THE CRACKS
posted on 14/11/18
comment by Hod idol the x factor - Mo's posh tin set! (U5117)
posted 1 minute ago
I think things are going a bit ott with Man City. While there is a difference in quality it is only the recent result that sets us apart. Reverse the result and we would be a point clear at the top.
----------------------------------------------------------------------
Reverse what result? You might as well start reversing Newcastle's results and assume if they didn't lose they'd be top of the league
posted on 14/11/18
comment by Devonshirespur (U6316)
posted 3 minutes ago
comment by NUTS (U21985)
posted 1 minute ago
Given the delays it would now be best IMO to wait until it is 100% complete rather than moving in as soon as possible and spending months on snags and extras etc
We should also focus on the fact that it will be the best in Britain once complete
----------------------------------------------------------------------
sounds lovely but every game we are not there we are losing money. Wembley attendances (bar Chelsea) are now restricted to 51k. We're paying a hefty hiring fee while refunding tickets to ST holders.
We need to get in ASAP and will do so as soon as its passed as safe.
----------------------------------------------------------------------
It’s not so much losing money though and more about not making as such. Sometimes you just have to bite the bullet and take a hit
The cost of a poor public image may actually cost more
posted on 14/11/18
The only place in London to watch Europa next season
posted on 14/11/18
comment by 8bit (U2653)
posted 6 minutes ago
The only place in London to watch Europa next season
----------------------------------------------------------------------
You do know we're 4th and you're 5th, right?
posted on 14/11/18
comment by NUTS (U21985)
posted 18 minutes ago
comment by Devonshirespur (U6316)
posted 3 minutes ago
comment by NUTS (U21985)
posted 1 minute ago
Given the delays it would now be best IMO to wait until it is 100% complete rather than moving in as soon as possible and spending months on snags and extras etc
We should also focus on the fact that it will be the best in Britain once complete
----------------------------------------------------------------------
sounds lovely but every game we are not there we are losing money. Wembley attendances (bar Chelsea) are now restricted to 51k. We're paying a hefty hiring fee while refunding tickets to ST holders.
We need to get in ASAP and will do so as soon as its passed as safe.
----------------------------------------------------------------------
It’s not so much losing money though and more about not making as such. Sometimes you just have to bite the bullet and take a hit
The cost of a poor public image may actually cost more
----------------------------------------------------------------------
Public image takes a bigger knock if we stay at Wembley all season.
Once this place opens, all will marvel in its awesomeness and the troubles we've had achieving it will be forgotten, or at least put into perspective.
posted on 14/11/18
They had a gathering of club bigwigs at the new stadium a few days ago, in one of the lounges with food and drink etc. Why would they bother doing something like that if completion was not close?
I can`t wait for December and the promised update, hopefully it can open in January and no later than February.
Surely once all the work is completed, any relevant safety certificates can be completed in a matter of days or at the worst a couple of weeks.
It`s all so frustrating and Spursy.
posted on 14/11/18
comment by Hod idol the x factor - Mo's posh tin set... (U5117)
posted 25 minutes ago
I think things are going a bit ott with Man City. While there is a difference in quality it is only the recent result that sets us apart. Reverse the result and we would be a point clear at the top.
----------------------------------------------------------------------
actually we'd be behind LFc on GD.
But i take your point although i would say it shows that we are small margins away from being very competitive. What City are achieving is amazing. 100 pts last season is simply brilliant. only 4 dropped this season which puts them on target for 100 again!!
IMO we are doing well to remain competitive given our circumstances and the way we have built our team vs the approach they have taken (which has prompted UEFA investigation)
posted on 14/11/18
comment by Devonshirespur (U6316)
posted 3 minutes ago
comment by NUTS (U21985)
posted 18 minutes ago
comment by Devonshirespur (U6316)
posted 3 minutes ago
comment by NUTS (U21985)
posted 1 minute ago
Given the delays it would now be best IMO to wait until it is 100% complete rather than moving in as soon as possible and spending months on snags and extras etc
We should also focus on the fact that it will be the best in Britain once complete
----------------------------------------------------------------------
sounds lovely but every game we are not there we are losing money. Wembley attendances (bar Chelsea) are now restricted to 51k. We're paying a hefty hiring fee while refunding tickets to ST holders.
We need to get in ASAP and will do so as soon as its passed as safe.
----------------------------------------------------------------------
It’s not so much losing money though and more about not making as such. Sometimes you just have to bite the bullet and take a hit
The cost of a poor public image may actually cost more
----------------------------------------------------------------------
Public image takes a bigger knock if we stay at Wembley all season.
Once this place opens, all will marvel in its awesomeness and the troubles we've had achieving it will be forgotten, or at least put into perspective.
----------------------------------------------------------------------
Yeah, I totally get that as well 👍
posted on 14/11/18
comment by Billy The Yidd (U3924)
posted 1 minute ago
They had a gathering of club bigwigs at the new stadium a few days ago, in one of the lounges with food and drink etc. Why would they bother doing something like that if completion was not close?
I can`t wait for December and the promised update, hopefully it can open in January and no later than February.
Surely once all the work is completed, any relevant safety certificates can be completed in a matter of days or at the worst a couple of weeks.
It`s all so frustrating and Spursy.
----------------------------------------------------------------------
I saw that. The photos and videos looked amazing albeit wasn't a fan of that MJ performance with the epileptic lighting.
Really close to the pitch which is great.
posted on 14/11/18
Wembley attendances are now restricted to 51k
----------------------
Why is that?
posted on 14/11/18
comment by Hulk's little brother Yoda (U1250)
posted 2 minutes ago
Wembley attendances are now restricted to 51k
----------------------
Why is that?
----------------------------------------------------------------------
They are only allowed by the Council to have a certain number of full capacity events every year, given the disruption caused when 70k-90k people rock up in the area.
posted on 14/11/18
comment by 8bit (U2653)
posted 48 minutes ago
The only place in London to watch Europa next season
----------------------------------------------------------------------
Selling tickets to Emirates?
posted on 14/11/18
comment by NotSoMagicJuande (U1913)
posted 4 hours, 45 minutes ago
In my mind I've sort of accepted that it's not going to be this season now. Though I don't own a season ticket so it doesn't bother me that much.
But I can't quite understand how it is taking SO much longer. There must be big reasons? And how did anyone think it would be ready by the start of the season?
I can't quite buy into the conspiracy theory the the club knew it would take this long all along
----------------------------------------------------------------------
Agree with you, been saying it for ages.
Firstly how did the club think we’d build such a large stadium from scratch in 15 months, considering another similar sized stadium in the emirates took 22 months?
Secondly, how the fack does a 15 month project run at least 6 months late? Not as if we suffered from some unforeseen natural disaster such as a facking volcano eruption, it was just plain bad planning and unrealistic expectations being set. Off the back off the mess we’ve made, Brentford actually increased the original timeframe to build their new stadium so as to avoid the embarrassment we’ve faced.
posted on 14/11/18
But i take your point although i would say it shows that we are small margins away from being very competitive. What City are achieving is amazing. 100 pts last season is simply brilliant. only 4 dropped this season which puts them on target for 100 again!!
——————-
City have a great team.............only cost them a £billion as well